Project Details
Installation of a 12-inch pipeline for block A of the Petrovictoria joint venture, connected to a 30-inch pipeline to optimize crude oil distribution in the San Tomé District – Ayacucho Division.
Scope of Work
- 01
1.1 kilometers of new pipeline constructed
- 02
12-inch production manifold installation
- 03
6-inch test and diluent manifold construction
- 04
Bayonets built for 15 wells
- 05
Seven wells migrated to collection pipes and a broader pipeline
- 06
Hydrostatic testing on multiple pipeline sizes
Results
- Production increased from 3,700–3,800 barrels per day to 7,000 barrels per day